This Flownex model simulates the aircraft cabin heating and ventilation system of a Sling Aircraft. The system supplies hot and cold air to six cabin vents, with the aim of distributing the airflow evenly and achieving a target cabin temperature of 25°C.
The model demonstrates how Flownex can be used to analyse airflow distribution, heat transfer and system performance under different aircraft operating conditions.
Industry: HVAC |
PROJECT FILE
The network can be downloaded by clicking on the download button below:
NETWORK DESCRIPTION
The Flownex network, shown in Figure 1, represents the aircraft air intake, hot and cold air supply paths, demister and six cabin ventilation outlets. The hot and cold airstreams mix to provide the required cabin temperature, while the flow restrictions and valve openings determine how air is distributed throughout the system.
The system is designed to meet the following requirements:
Cabin vent flow distribution: Deliver a minimum mass flow rate of 8 kg/h through each of the six cabin vents, with the flow distributed as evenly as practicable.
Cabin temperature: Achieve a target cabin temperature of 25°C through the mixing of hot and cold airstreams.
Demister flow rate: Maintain a minimum mass flow rate of 10 kg/h through the demister.
Flow restriction sizing: Determine suitable restrictor diameters for the cabin outlet paths to balance the airflow distribution.
Valve settings: Determine appropriate valve openings to satisfy the airflow and temperature requirements.
Worst-case performance: Verify that the design meets the required airflow and temperature targets at minimum aircraft speed and maximum operating altitude.
The design is developed by adjusting the restrictor diameters and valve openings to achieve the required flow distribution and temperature. Since the available intake airflow depends on aircraft speed and altitude, the system is evaluated across different operating conditions. Particular attention is given to the worst-case condition, where minimum aircraft speed and maximum altitude result in the lowest available intake airflow.
The following assumptions are applied in the model:
The hot air supply temperature varies linearly with aircraft speed.
Ambient temperature and pressure vary with altitude.
The mass flow rate of air entering the aircraft depends on aircraft speed.
Cabin pressure is assumed to be equal to ambient pressure.
Volume flow rate boundary conditions are used to represent the air intake. Additional bleed lines are therefore provided on the cold air paths to avoid imposing a fixed intake flow rate through a closed vent. The bleed lines open proportionally to the remaining closed fraction of the corresponding cold air vent, expressed as (1-x), where (x) is the vent opening fraction. This allows airflow to be redirected when a vent is closed while maintaining mass continuity in the network.
RUNNING THE SIMULATION
The aircraft cabin heat system has already been designed. The model is provided as a demonstration of how Flownex can be used to analyse and optimise an aircraft cabin heating and ventilation system.
A series of saved snapshots illustrates the design process and the effect of different operating conditions. The Flownex Designer tool was used to develop the design. The snapshots are divided into two stages: balancing the cabin vent flow rates and evaluating the system under worst-case operating conditions.
1. Balancing the cabin vent flow rates
The following snapshots demonstrate the process of balancing the airflow through the six cabin vents:
Same flow resistances: Shows the idealised case where all six outlet paths have identical flow resistances, resulting in equal flow rates.
Different flow resistances: Demonstrates how differences in the outlet path resistances result in unequal flow rates through the six cabin vents.
Design start – footwell: Shows the initial stage of adjusting the footwell restrictor to balance the flow resistances across the six outlet paths.
Designed footwell: Shows the revised footwell restriction and the achievement of the required minimum mass flow rate of 8 kg/h.
All designed: Shows the completed flow balancing design, with all six cabin vents achieving the required minimum mass flow rate of 8 kg/h.
2. Worst-case operating conditions
The completed design is evaluated under the following worst-case operating conditions:
Aircraft speed: 60 KIAS
Altitude: 13 000 ft
Minimum demister mass flow rate: 10 kg/h
Minimum cabin vent mass flow rate: 8 kg/h per vent
Target cabin temperature: 25°C
The following snapshots illustrate the evaluation and optimisation process:
Worst case: Shows the initial system performance under the specified worst-case conditions, where the available intake airflow is insufficient to meet the required flow rates.
Designed for worst case – valve adjustments: Shows how adjusting the valve openings improves the airflow distribution and hot-to-cold air mixing to meet the demister flow rate and cabin temperature requirements.
Designed for worst case – hot air duct diameter: Demonstrates the effect of increasing the hot air intake duct diameter on the available airflow. A duct diameter of 0.065 m provides sufficient airflow to achieve the minimum required mass flow rate of 8 kg/h through each cabin vent under the specified worst-case conditions.
Sensitivity analysis: Evaluates the effect of aircraft speed on cabin vent mass flow rates and cabin temperature at maximum operating altitude, with the valve positions held constant. This illustrates how changes in aircraft speed affect system performance without further valve adjustments.